@2026-08-25 13:22:43 - Calle 15 de Febrero

Calle 15 de Febrero
FIVEo1 PANAJACHEL COMPLETE URBAN STREET, SIDEWALK, HERITAGE PAVING & TRANSIT-HUB REDEVELOPMENT 100% Surface Replacement • Community-Labor Program • Flood-Resilient Urban Grade • Future Rail/Transit Hub --- PREPARED FOR Municipalidad de Panajachel Concejo Municipal de Panajachel Panajachel, Departamento de Sololá República de Guatemala PREPARED BY FIVEo1 / Evan Winter Proposal Date: August 25, 2026 Project Location: Panajachel, Sololá, Guatemala Currency: Guatemalan Quetzales (Q) Bid Basis: 2026 local-market and public-project benchmarks --- TABLE OF CONTENTS Section Title Page 1 Project Purpose 1 2 Existing Urban Network — Bid Basis 2 3 100% Removal Program 3 4 New Panajachel Surface System 4 5 Sand and Natural-Composite Design 5 6 Heritage Paver Design 6 7 Sidewalk-to-Sidewalk Reconstruction 7 8 Drainage-First Engineering 8 9 20–75 Inch Flood / Lake-Rise Design 9 10 Traffic System Redesign 10 11 Future Train / Transit Hub 11 12 Local Community Workforce Program 12 13 Local Procurement 13 14 2026 Cost Benchmarks 14 15 Preliminary FIVEo1 Bid Schedule 15 16 Value Engineering Target 16 17 Phased Construction 17 18 Community Participation 18 19 Maintenance Model 19 20 Performance Requirements 20 21 Public-Project Coordination 21 22 Bid Structure 22 23 FIVEo1 Procurement Principle 23 24 Bid Evaluation 24 25 Required Bid Deliverables 25 26 Acceptance Standard 26 27 FIVEo1 End-State 27 28 Preliminary FIVEo1 Bid Value 28 29 Official Municipal Recipient and Government Contact Information 29 30 Concejo Municipal de Panajachel 30 31 Formal Submission Route 31 32 Official FIVEo1 Proposal Contact Block 32 33 FIVEo1 Submission Identification 33 34 Official Government Contact 34 --- SECTION 1: PROJECT PURPOSE FIVEo1 proposes a complete reconstruction of Panajachel's urban transportation and pedestrian surface system. The project replaces the existing street-and-sidewalk surface system throughout the defined urban intervention area rather than conducting isolated repairs. Proposed System Objectives 1. Remove existing asphalt, concrete, conventional paving, damaged stone, loose rock, unsuitable composite materials and deteriorated sidewalk surfaces. 2. Regrade the complete transportation corridor system. 3. Construct new permeable drainage and structural layers. 4. Install a new heritage-pattern paving system reflecting Panajachel's architectural and cultural character. 5. Use locally sourced natural aggregate, stone, sand and locally appropriate composite materials wherever technically suitable. 6. Reconstruct sidewalks from property frontage to property frontage. 7. Establish continuous pedestrian accessibility. 8. Raise critical finished grades where required for flood resilience. 9. Design drainage around a potential 20–75 inch (0.51–1.91 m) lake/flood-level rise scenario through phased elevation and flood-management engineering. 10. Reorganize traffic circulation so that a future rail or high-capacity transit hub can be incorporated without rebuilding the street system again. 11. Establish a central multimodal transportation district connecting road, pedestrian, bicycle, local shuttle, lake transportation and future rail service. 12. Create a permanent municipal paving standard that can be maintained by local workers. --- SECTION 2: EXISTING URBAN NETWORK — BID BASIS Preliminary Planning Quantities For preliminary bidding purposes, FIVEo1 establishes the following working quantity: Component Preliminary Quantity Urban roadway network 20,000 linear m Average roadway reconstruction width 6.0 m Road surface 120,000 m² Average sidewalk width, both sides combined 4.0 m Sidewalk surface 80,000 m² Total primary reconstructed surface 200,000 m² Property-frontage interfaces Approximately 40,000 linear m Primary drainage allowance 20,000 linear m Future transit corridor reservation Included in master plan Important Note The 20-km figure is a planning quantity, not a substitute for a cadastral/topographic survey. Final payment quantities shall be established by field survey and approved municipal construction drawings. --- SECTION 3: 100% REMOVAL PROGRAM The project begins with complete controlled removal of the existing surface system within each construction section. Materials to be Removed Category Materials Paving Materials Asphalt, Concrete, Existing concrete paving, Existing adoquín Stone Materials Deteriorated stone paving, Loose rock Subsurface Materials Unsuitable aggregate, Existing sidewalk slabs Structural Elements Failed curbs, Damaged drainage structures Surface Elements Unsuitable composite surface materials, Obsolete traffic islands, Unnecessary pavement markings, Abandoned surface fixtures Material Recovery Process Existing material will be separated at the work site into: 1. Reusable stone 2. Recyclable aggregate 3. Inert demolition material 4. Organic/natural material Sustainability Objective The objective is to prevent the replacement project from simply transferring the existing material problem elsewhere. --- SECTION 4: NEW PANAJACHEL SURFACE SYSTEM 4.1 Roadway Construction Proposed Roadway Section Layer Description 1 Finished heritage paver 2 Sand bedding layer 3 Graded aggregate leveling layer 4 Structural granular base 5 Stabilized subgrade where required 6 Permeable drainage layer where required 7 Geotechnical subgrade Heavy-Traffic Streets Component Specification Heritage paver 80 mm heritage-pattern concrete/stone composite Bedding sand 30–40 mm Graded base 150–200 mm Geotextile/geogrid Where required Subgrade Compacted Local Streets Component Specification Heritage paver 60–80 mm Bedding sand 30 mm Granular base 150 mm Subgrade Compacted Pedestrian Streets Component Specification Heritage paver 60 mm heritage paver/natural stone composite Bedding sand Sand Base Granular permeable base Drainage layer Drainage layer Final Engineering Final thicknesses shall be established by geotechnical and traffic-loading calculations. --- SECTION 5: SAND AND NATURAL-COMPOSITE DESIGN The surface system becomes a municipal architectural palette. Design Materials Material Character Lake Sand Light cream / warm beige Volcanic Sand Dark gray / charcoal Atitlán Stone Gray-brown natural aggregate Terracotta Warm red/brown accent Earth Muted tan Charcoal Traffic and structural accent Secondary Color Applications Secondary colors form: · Borders · Pedestrian crossings · Intersections · Drainage patterns · Plaza edges · Transit platforms · Bicycle lanes · Directional bands · Neighborhood identification · Heritage motifs --- SECTION 6: HERITAGE PAVER DESIGN The paving pattern shall be developed specifically for Panajachel. Paver Pattern Library Pattern Description Lago Parallel bands representing the lake Maya Geometric interlocking regional motif Volcán Radiating forms at plazas and major intersections Camino Directional paving bands Centro Decorative central-city pattern Transporte High-contrast transportation pattern Modular Design Philosophy The designs will be modular so damaged sections can be removed and replaced without reconstructing an entire block. --- SECTION 7: SIDEWALK-TO-SIDEWALK RECONSTRUCTION Every selected corridor will be rebuilt from property frontage to property frontage. Sidewalk Program Elements · Continuous pedestrian routes · Accessible ramps · Tactile navigation surfaces · Drainage · Tree zones · Utility access · Lighting locations · Commercial frontage zones · Loading zones · Emergency access · Bicycle interfaces · Transit stops Standard Sidewalk Hierarchy Zone Standard Primary pedestrian corridor 2.0–3.0 m clear walking zone Secondary corridor Approximately 1.8 m minimum where right-of-way permits Commercial frontage Pedestrian zone separated from merchandise/loading Transit corridor Expanded sidewalk/platform zone --- SECTION 8: DRAINAGE-FIRST ENGINEERING No paving shall be installed before the drainage strategy is completed. Drainage System Components Component Description Crossfall drainage Sloped surfaces directing water to collection points Permeable surfaces Allow water infiltration where appropriate Infiltration zones Where soil conditions permit Covered drainage channels Protected conduits for stormwater Inspection points Access for maintenance and cleaning Stormwater collectors Catch basins and intake structures Protected outfalls Erosion-controlled discharge points Sediment-control structures Filtration and settling systems Detention/storage areas Temporary water retention Emergency overflow routes Designated flood pathways --- SECTION 9: 20–75 INCH FLOOD / LAKE-RISE DESIGN The master plan shall be engineered against a planning scenario in which water levels or flood conditions require finished urban grades to be raised between: Metric Value Minimum 20 inches = 50.8 cm Maximum 75 inches = 190.5 cm This is a design scenario rather than a prediction of a specific future Lake Atitlán water level. Zoning Approach Zone Planning Treatment Zone 1 — Existing high ground Minimal elevation change Zone 2 — Moderate-risk corridors Approximately 20–40 in / 50.8–101.6 cm Zone 3 — High-risk corridors Approximately 40–60 in / 101.6–152.4 cm Zone 4 — Critical waterfront/transit areas Up to approximately 75 in / 190.5 cm where justified Property Interface Where street elevation is raised, property entrances receive coordinated: · Ramps · Steps · Thresholds · Drainage · Frontage transitions --- SECTION 10: TRAFFIC SYSTEM REDESIGN The project replaces the existing incremental traffic pattern with a hierarchical transportation system. Traffic Hierarchy Level Description A. Regional Access Regional vehicles enter through designated gateway corridors B. Urban Distributor Roads Two-way movement maintained on selected principal corridors C. Local Streets Lower-speed streets become neighborhood-access corridors D. Pedestrian-Priority Streets Selected central streets become pedestrian-first or restricted-access corridors E. Commercial Delivery Windows Commercial deliveries operate during defined periods F. Bicycle Circulation Continuous bicycle routes wherever right-of-way permits G. Emergency Circulation Emergency routes remain continuously connected --- SECTION 11: FUTURE TRAIN / TRANSIT HUB The reconstructed street system shall reserve space for a future transportation hub. Proposed Multimodal Terminal Components Component Description Future rail platform Reserved rail infrastructure Passenger terminal Building for passenger services Local shuttle terminal Short-distance transportation Regional bus terminal Inter-city connections Taxi area Regulated taxi service zone Bicycle parking Secure bike storage Pedestrian plaza Public gathering space Lake transportation connection Water transport integration Commercial frontage Retail and services Tourist information Visitor services Freight/service access Logistics support Emergency access First responder routes Future Implementation A protected transportation corridor shall be identified during master planning. A separate rail feasibility study shall determine: · Alignment · Grade · Engineering structure · Right-of-way · Station location · Rail technology · Passenger capacity · Regional connection · Environmental requirements --- SECTION 12: LOCAL COMMUNITY WORKFORCE PROGRAM FIVEo1 proposes that the primary construction workforce be recruited from Panajachel and surrounding Sololá communities. The project establishes local employment as a central procurement objective. Proposed Workforce Categories Position Bid Baseline General local worker Q133.82/day Paving worker Q133.82/day minimum Demolition worker Q133.82/day minimum Landscaping worker Q133.82/day minimum Drainage worker Q133.82/day minimum Local crew leader Q175–225/day Skilled local mason Q175–250/day Equipment operator Q225–300/day Local foreman Q250–350/day Compensation Framework Actual compensation shall be established under: · Applicable Guatemalan labor requirements · Final municipal procurement documents · Collective bargaining considerations · Market conditions at time of contract --- SECTION 13: LOCAL PROCUREMENT The project prioritizes Panajachel/Sololá-area suppliers. Potential Procurement Channels Supplier Location CONSTRUFERSA JUCANYA Panajachel area Distribuidora PanaFerro S.A. Panajachel area Mayasersa Home Center Regional FERRE FÁCIL Panajachel AKÍ Superferretería Panajachel Construfersa Norte Regional Professional Services Engineering and architectural support may also be sourced locally. Procurement Process Final procurement shall be competitively quoted through: · Municipal procurement procedures · Guatemalan public procurement framework · International competitive bidding where required --- SECTION 14: 2026 COST BENCHMARKS Recent Local Project Data Project Amount Area Unit Rate Calle El Abuelo Q1,124,000 200 m² Q5,620/m² Callejón San Francisco Q250,000 200 m² Q1,250/m² Calle El Colibrí Q600,000 400 m² Q1,500/m² Riviera del Río Q160,000 50 m² Q3,200/m² Benchmark Analysis Calculation Result Average of four benchmarks Q2,892.50/m² Average excluding highest benchmark Q1,983.33/m² Highest benchmark Q5,620/m² Lowest benchmark Q1,250/m² Range Q4,370/m² Interpretation The substantial variation reflects differences in: · Project scope · Site conditions · Material requirements · Accessibility · Utility relocation needs · Design complexity FIVEo1 Application Final FIVEo1 rates shall be established through: · Measured quantities · Competitive bids · Detailed engineering design · Site-specific conditions --- SECTION 15: PRELIMINARY FIVEo1 BID SCHEDULE 200,000 m² Preliminary Total Reconstruction Area Work Item Unit Rate Quantity Amount Survey, staking & design Q75/m² 200,000 m² Q15,000,000 Complete removal Q180/m² 200,000 m² Q36,000,000 Excavation/subgrade Q75/m² 200,000 m² Q15,000,000 Granular structural base Q125/m² 200,000 m² Q25,000,000 Drainage infrastructure Q250/m² 200,000 m² Q50,000,000 Heritage roadway pavers Q450/m² 120,000 m² Q54,000,000 Heritage sidewalks Q285/m² 80,000 m² Q22,800,000 Curbs/edge restraints Q225/m 40,000 m Q9,000,000 Accessibility/ramp works Allowance — Q5,000,000 Flood-grade adaptation Q300/m² 200,000 m² Q60,000,000 Landscaping/street trees Allowance — Q5,000,000 Traffic redesign/signage Allowance — Q4,000,000 Transit-hub reservation Allowance — Q5,000,000 Construction management/QC Allowance — Q10,000,000 PRELIMINARY PROGRAM VALUE: Q315,800,000 --- SECTION 16: VALUE ENGINEERING TARGET Reduction Scenarios Reduction Target Value 10% Q284,220,000 15% Q268,430,000 20% Q252,640,000 Target Optimized Program Q252,640,000 – Q284,220,000 Value Engineering Measures Category Measures Materials Local aggregate, Reusable demolition material, Modular paver manufacturing, Standardized paving modules Labor Local workforce, Community labor program Procurement Phased procurement, Competitive material bidding, Local fabrication Municipal Municipal stockpiling, Coordinated utility excavation --- SECTION 17: PHASED CONSTRUCTION Phase Description Duration Phase 0 Survey & master plan 3–6 months Phase 1 Demonstration district (1–2 km) 6–12 months Phase 2 Primary transportation network (approx. 5 km) 12–18 months Phase 3 Central Panajachel (approx. 5 km) 12–18 months Phase 4 Residential network (approx. 6 km) 18–24 months Phase 5 Transit/rail preparation (approx. 2 km equivalent) 6–12 months Total Estimated Duration 4–7 years depending on funding, procurement and construction sequencing. Sequencing Factors Final sequencing shall be determined by: · Municipal engineering requirements · Traffic management considerations · Drainage requirements · Procurement schedules · Community priorities · Utility coordination · Funding availability --- SECTION 18: COMMUNITY PARTICIPATION PANAJACHEL COMMUNITY CONSTRUCTION CORPS The project establishes a community-based workforce program. Community Participation Opportunities Category Activities Demolition Controlled removal, Material sorting, Site preparation Construction Paving, Masonry, Drainage installation Landscaping Tree planting, Streetscape finishing Maintenance Cleaning, Inspection, Repairs Support Material handling, Site safety, Quality control Benefits · Local employment · Skills training · Community ownership · Project oversight · Economic retention · Long-term maintenance capacity --- SECTION 19: MAINTENANCE MODEL Modular Maintenance Approach Remove → Replace → Compact → Reopen Maintenance Resources Provided Resource Description Paving patterns Standardized design documentation Replacement modules Prefabricated paver units Material inventories Stockpiled materials Drainage maps Underground infrastructure documentation Elevation records Grade and flood-level documentation Utility maps Underground utility locations Inspection schedules Routine maintenance calendar Municipal Capacity Building The project includes: · Training for municipal maintenance crews · Equipment provision · Spare parts inventory · Technical documentation · Long-term material supply agreements --- SECTION 20: PERFORMANCE REQUIREMENTS Streets Requirement Standard Surface replacement 100% within approved project limits Structural surface Continuous, load-bearing Traffic hierarchy Defined and implemented Drainage Controlled and managed Accessibility Crossings and curb ramps Sidewalks Requirement Standard Reconstruction 100% within approved project limits Pedestrian routes Continuous and unobstructed Accessibility Accessible transitions Paving Standardized and modular Materials Requirement Standard Color palette Natural-color scheme Aggregate Locally appropriate Paver system Modular and replaceable Material recovery Reuse where practical Flood Resilience Requirement Standard Finished elevations Mapped and documented Emergency drainage Designated routes Critical corridors Raised and protected Transit infrastructure Protected from flood Transportation Requirement Standard Through-traffic Reduced where unnecessary Pedestrian priority Implemented in central areas Bicycle integration Where right-of-way permits Future transit Reservation and protection Multimodal hub Compatible design --- SECTION 21: PUBLIC-PROJECT COORDINATION The project shall be coordinated with existing Panajachel municipal infrastructure programs. Coordination Objectives 1. Consolidation — Combine future road, drainage, sidewalk and transportation investment under one long-term urban framework 2. Efficiency — Prevent repeated excavation of newly constructed streets 3. Integration — Align with municipal water, sewer, electrical and telecommunications projects 4. Phasing — Coordinate with municipal budget cycles and project timelines 5. Community — Align with community development priorities Coordinating Departments Department Responsibility Dirección Municipal de Planificación Master planning and coordination Municipal Public Works Construction and maintenance Municipal Drainage Stormwater management Municipal Traffic Traffic engineering Municipal Environment Environmental compliance Municipal Economic Development Local procurement and workforce --- SECTION 22: BID STRUCTURE Contract Packages Package Scope Estimated Value A Survey, engineering and master planning Q15,000,000 B Demolition and material recovery Q36,000,000 C Drainage and underground infrastructure Q50,000,000 D Roadway reconstruction Q80,000,000 E Sidewalk and pedestrian reconstruction Q22,800,000 F Heritage paving manufacture and installation Q54,000,000 G Landscaping and public realm Q5,000,000 H Traffic system and signage Q4,000,000 I Flood-resilience elevation works Q60,000,000 J Future multimodal/rail hub reservation Q5,000,000 Procurement Strategy · Phase 0: Single-source or limited competition for design/planning · Phase 1-5: Competitive bidding for construction packages · Package Size: Sized for local contractor participation · Bid Preferences: Local workforce and local procurement preferences --- SECTION 23: FIVEo1 PROCUREMENT PRINCIPLE Procurement Hierarchy Local Workers → Local Materials → Local Contractors → Local Suppliers → Regional Suppliers → National Suppliers → Imported Materials Economic Retention Strategy The economic objective is to retain the maximum feasible percentage of project expenditure within Panajachel and Sololá. Implementation Measures Level Preference Local workers Primary workforce Local materials First sourcing priority Local contractors Bid preferences Local suppliers First procurement channel Regional suppliers Second sourcing tier National suppliers Third sourcing tier Imported materials Only where technically necessary --- SECTION 24: BID EVALUATION Evaluation Criteria and Weights Criterion Weight Price 35% Local workforce participation 20% Technical construction capability 15% Local procurement 10% Schedule 10% Material durability 5% Environmental/material recovery plan 5% TOTAL 100% Evaluation Process 1. Technical Qualification — Pass/Fail on minimum technical requirements 2. Financial Qualification — Pass/Fail on financial capacity 3. Score Calculation — Weighted scoring on evaluation criteria 4. Best Value Determination — Combination of price and technical factors 5. Local Preference — Application of local workforce and procurement preferences --- SECTION 25: REQUIRED BID DELIVERABLES Each bidder shall provide: # Deliverable Requirement 1 Company registration Legal documentation 2 Relevant construction experience Project references 3 Local workforce plan Employment projections 4 Equipment list Availability and ownership 5 Material-source list Provenance and supply 6 Unit-price schedule Detailed cost breakdown 7 Construction schedule Phased timeline 8 Traffic-management plan Construction impacts 9 Demolition/recovery plan Material management 10 Drainage plan System installation 11 Quality-control plan Inspection and testing 12 Safety plan Worker protection 13 Environmental management plan Impact mitigation 14 Flood-elevation methodology Grade implementation 15 Heritage paving samples Material examples 16 Warranty Workmanship guarantee 17 Maintenance plan Long-term management 18 Local economic participation percentage Economic benefit --- SECTION 26: ACCEPTANCE STANDARD Inspection and Acceptance Requirements Each completed section shall pass: Inspection Requirement Elevation inspection Within design tolerances Compaction testing Meets density requirements Drainage testing Functional and unobstructed Pavement inspection Flatness and finish quality Accessibility inspection Meets requirements Utility-access inspection Functional access Traffic inspection Markings and signage Material inspection Quality and conformity Final municipal walkthrough Client acceptance Acceptance Documentation · Inspection reports · Test results · Quality control records · As-built documentation · Warranty certificates · Maintenance documentation --- SECTION 27: FIVEo1 END-STATE The completed project transforms Panajachel into a coordinated urban transportation system. ONE System Approach The finished city will have: Element Description One continuous paving language Unified heritage design One coordinated drainage system Integrated stormwater management One pedestrian network Continuous, accessible One traffic hierarchy Organized movement One flood-resilience strategy Coordinated elevation One heritage architectural identity Cultural character One future transit reservation Protected corridor One multimodal transportation center Integrated mobility One locally maintainable construction standard Sustainable design Community Impact · Enhanced mobility · Improved safety · Flood protection · Economic development · Cultural preservation · Environmental sustainability · Community pride --- SECTION 28: PRELIMINARY FIVEo1 BID VALUE Summary Metrics Metric Value Preliminary reconstructed surface 200,000 m² Preliminary urban road network 20 km Roadway replacement 100% within approved limits Sidewalk replacement 100% within approved limits Complete drainage integration Included Heritage paving system Included Community labor program Included Flood-adaptation envelope 20–75 in / 50.8–190.5 cm Future multimodal/rail reservation Included Preliminary Program Bid Q315,800,000 Value-Engineered Target Q252,640,000 – Q284,220,000 Final Contract Value Final contract value shall be established from: · Completed municipal survey · Engineering drawings · Measured quantities · Competitive unit-price bids --- SECTION 29: OFFICIAL MUNICIPAL RECIPIENT AND GOVERNMENT CONTACT INFORMATION MUNICIPALIDAD DE PANAJACHEL Category Information Department Sololá Municipality Panajachel Country República de Guatemala Official Municipal Government Municipalidad de Panajachel Concejo Municipal de Panajachel Official Municipal Address Calle Principal, Zona 2 Panajachel, Sololá, Guatemala Main Municipal Telephone +502 7762-1081 Official Municipal Email munipana@munipana.gob.gt Official Municipal Website https://municipalidaddepanajachel.gob.gt/ Official Municipal Contact Page https://municipalidaddepanajachel.gob.gt/index.php/contactenos/ Official Municipal Public-Information Portal https://munipanajachel.laip.gt/ Verification The municipality's official contact page confirms the: · Calle Principal, Zona 2 address · Telephone number · Municipal email address --- SECTION 30: CONCEJO MUNICIPAL DE PANAJACHEL Municipal Governing Body The municipal governing body identified in the municipality's official public-policy documentation is: No. Name Municipal Position 1 César Pablo Piedrasanta Rodríguez Alcalde Municipal 2 Gustavo López Can Concejal I 3 José Arnoldo Rosales Aguilar Concejal II 4 Juan Antulio Anleu Sánchez Concejal III 5 Aura Virginia López Flores Concejal IV 6 Victor Yach Rosales Síndico Primero 7 Pedro Matías García y García Síndico Segundo 8 Jim Preston Yach Queché Concejal Suplente I 9 Catalina Rivera Miranda Concejal Suplente II 10 Byron Ismael Mateo Sac Síndico Suplente Verification The names and positions above are identified in the Municipalidad de Panajachel's official municipal-policy publication. --- SECTION 31: FORMAL SUBMISSION ROUTE Primary Governmental Recipient CONCEJO MUNICIPAL DE PANAJACHEL Municipalidad de Panajachel Calle Principal, Zona 2 Panajachel, Sololá, Guatemala Technical Municipal Recipient Dirección Municipal de Planificación — DMP The FIVEo1 proposal should be submitted to the Municipal Council for formal consideration and simultaneously routed to the municipality's technical planning function for: · Technical review · Measurement · Feasibility analysis · Preparation of any subsequent municipal procurement documents Public-Information / Records Channel Municipalidad de Panajachel — Información Pública / LAIP This channel may be used for official municipal information and public-record requests concerning: Category Topics Infrastructure Municipal infrastructure, Existing street projects Finance Contracts, Budgets Planning Road inventories, Municipal planning, Drainage projects Operations Public works, Procurement Governance Municipal agreements, Project records --- SECTION 32: OFFICIAL FIVEo1 PROPOSAL CONTACT BLOCK TO: Concejo Municipal de Panajachel Municipalidad de Panajachel Panajachel, Sololá, Guatemala ATTENTION: Alcalde Municipal César Pablo Piedrasanta Rodríguez COPY: Concejal I — Gustavo López Can Concejal II — José Arnoldo Rosales Aguilar Concejal III — Juan Antulio Anleu Sánchez Concejal IV — Aura Virginia López Flores Síndico Primero — Victor Yach Rosales Síndico Segundo — Pedro Matías García y García Concejal Suplente I — Jim Preston Yach Queché Concejal Suplente II — Catalina Rivera Miranda Síndico Suplente — Byron Ismael Mateo Sac TECHNICAL REVIEW: Dirección Municipal de Planificación Municipalidad de Panajachel OFFICIAL MUNICIPAL CONTACT: +502 7762-1081 munipana@munipana.gob.gt OFFICIAL ADDRESS: Calle Principal, Zona 2 Panajachel, Sololá, Guatemala --- SECTION 33: FIVEo1 SUBMISSION IDENTIFICATION Field Information Project FIVEo1 Panajachel Complete Urban Reconstruction Program Proposal 100% Urban Street & Sidewalk Surface Replacement, Heritage Paving, Drainage, Traffic Redesign, Flood-Resilient Grade Adaptation and Future Multimodal/Transit-Hub Reservation Prepared by FIVEo1 / Evan Winter Submission date August 25, 2026 Submitted to Concejo Municipal de Panajachel, Municipalidad de Panajachel, Sololá, Guatemala Project jurisdiction Municipio de Panajachel, Departamento de Sololá, República de Guatemala Preliminary program value Q315,800,000 Value-engineered target Q252,640,000–Q284,220,000 --- SECTION 34: OFFICIAL GOVERNMENT CONTACT MUNICIPALIDAD DE PANAJACHEL CONCEJO MUNICIPAL DE PANAJACHEL Calle Principal, Zona 2 Panajachel, Sololá, Guatemala Tel.: +502 7762-1081 Email: munipana@munipana.gob.gt Official Website: https://municipalidaddepanajachel.gob.gt/ Official Public Information Portal: https://munipanajachel.laip.gt/ Formal Recipient: CONCEJO MUNICIPAL DE PANAJACHEL Attention: César Pablo Piedrasanta Rodríguez, Alcalde Municipal --- RESPECTFULLY SUBMITTED Evan Winter FIVEo1 Avalon, California August 25, 2026
← Back to Fiveo1
▼
▲